A new era of simple, connected project management.
Right now
By week six, none of them agree. BidLoop is one system for the whole job, so there is only ever one set of numbers.
What changes
Price once
The programme, the cash flow, the budget and the claim all come off the estimate you already built. Nothing gets typed in twice.
Move a date
Push a task and your cash flow re-phases and the claim follows. No rebuilding a forecast every time the job changes — which is every week.
See it early
Costs land against the code as invoices are approved, so an overrun shows up during the job instead of at the close-out meeting.
And it compounds
What the work actually cost becomes a benchmark, and rates learn from real invoices. Your estimating gets better because you used it.
Proof, not promises
The same job as above, moving through the app. The figures are left in so you can check each screen against the last.
Price
A real build-up on every line — the crew, the plant, the materials — each carrying its own cost code. Direct cost $129,950, contract $155,940. Hold those two figures.
Programme
Days go against work you have already priced. Critical path, float and working-day calendars, in and out of MS Project — and moving a date moves the cash flow and the claim with it.
Win
Built from the estimate's own lines, split by cost code, and it totals $129,950 — the direct cost from the screen above. Not a number that got typed twice and happens to agree.
Claim
The two months come to $155,940 — the contract the estimate produced. Item 1.02 splits 14.29 and 85.71 per cent because that is how the programme runs it, not because anyone typed it.
How it works
It is called BidLoop because the last step feeds the first: what a job actually cost is what prices the next one.
Price
A real build-up on every line — crews, plant, materials, subcontract — off your own company rate library.
Submit
Priced bill, letter of offer, methodology and assumptions — the whole submission pack out of the same job.
Win
One click converts the estimate you priced into the budget you will be measured against. Nothing retyped.
Programme
A real Gantt programme — critical path, float, working-day calendars — with your days against the work you priced.
Claim
Progress claims and variations straight off the programme, editable after submission when the job changes.
Forecast
Budget, committed, actual and forecast by cost code, across every job you have running.
and round again
What the job actually cost becomes a benchmark, and your rates learn from real invoices — so the next estimate starts from what happened, not from what someone remembers.
Straight answers
We're building this with the first handful of contractors who need it. Leave your details and we'll come back to you before it opens.
Three fields. No newsletter, no drip campaign.